Lybrary.com: ebooks and download videos Search All  Title  Author 
Home / Nonfiction / Medical / Physiology

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

$130.00
| £106.23 | €123.01 | Ca$177.11 | Au$174.05
by Kenneth Maiese
What is this?DRM-EPUB by download  |  $130.00
What is this?DRM-PDF by download  |  $130.00
add to wish list
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies by Kenneth Maiese

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies.  Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.

  • Covers the role of mTOR by internationally recognized expert contributors in the field.
  • Provides a clear picture of the complexity of mTOR signaling as well as of the different approaches that could target this pathway at various levels.
  • Includes analysis of the role of mTOR and in both health and disease.
  • Serves as an important resource for a broad audience of healthcare providers, scientists, drug developers, and students in both clinical and research settings.
  • To view this DRM protected ebook on your desktop or laptop you will need to have Adobe Digital Editions installed. It is a free software. We also strongly recommend that you sign up for an AdobeID at the Adobe website. For more details please see FAQ 1&2. To view this ebook on an iPhone, iPad or Android mobile device you will need the Adobe Digital Editions app, or BlueFire Reader or Txtr app. These are free, too. For more details see this article.


    SHARE  Share by Email  Share on Facebook  Share on Twitter  Share on Linked In  Share on Delicious
    or call in the US toll free 1-888-866-9150 product ID: 818131

    Ebook Details
    Pages: 472
    Size: 16.6 MB
    Publisher: Academic Press
    Date published:   2016
    ISBN: 2370007284825 (DRM-EPUB)
    9780128027554 (DRM-PDF)

    DRM Settings
    Copying:allowed
    Printing:allowed
    Read Aloud:  not allowed

This product is listed in the following categories:

Nonfiction > Medical > Anatomy
Nonfiction > Medical > Physiology

If you find anything wrong with this product listing, perhaps the description is wrong, the author is incorrect, or it is listed in the wrong category, then please contact us. We will promptly address your feedback.

Submit 5 page SummaryWhat is this?

03/25/2017
© 2017 Lybrary.com